EN

Major overhaul of Su-25

In 2018-2019, for the first time in the territory of Kazakhstan, work is underway on major repairs with the completion of su-25 aircraft. After the repair, the latest modernization of su-25 aircraft will meet all the requirements of the Ministry of defense of Kazakhstan.

Technical details:

  • Crew: 1 pilotк
  • Length: 15, 36 m (with PSS)
  • Wingspan: 14, 36 m
  • Height: 4, 8 m
  • Max take - off weight: 17 600 kg
  • Power plant: 2 × TRD R – 95 SH (turbojet engine)
FaLang translation system by Faboba